Size the solar system around the site, not the package
Your bill is the starting point. Load timing, sanctioned load, roof space and backup priorities complete the picture.
What people get wrong
I treat a package list as a conversation starter, not a finished engineering design. Two sites with similar monthly electricity bills can need different systems. One may use most of its energy during working hours; another may use it after sunset. The bill amount alone also reflects tariffs and charges, so it is not the same thing as energy consumption. I prefer to read the units and understand when the electricity is used.
The issue on a Pakistani site
On a roof, usable space is rarely the same as the total covered area. Water tanks, shade, access paths and the condition of the structure affect the layout. On the electrical side, I check the connection, sanctioned load and equipment already installed. A proposed export arrangement must also be checked against current DISCO requirements. For a factory, production shifts and motor loads can change the answer considerably. For a home, the request for night-time backup often changes both the inverter choice and the battery requirement.
The practical solution
I begin with recent electricity bills, the site location and a discussion of the loads. A survey then checks the roof or land, shading, mounting options and electrical installation. Engineering brings these inputs together into a PV layout, string arrangement, inverter selection and protection design. If storage is needed, I size it separately around essential-load power and the intended backup duration.
I also explain the difference between panel capacity in kWp, inverter power in kW and battery energy in kWh. These numbers describe different parts of the system and should not be used interchangeably. A useful proposal should make those distinctions visible. Share your operating hours and any planned new machinery or appliances before the design is finalised. That gives the engineering team a better basis than simply choosing the largest package that fits the budget.
Engr. Safdar Ali, Technical Adviser
Watch: this topic explained
A video from Engr. Safdar Ali will appear here.
No video is available in this section yet. Explore the written insights or ask a technical question.